Signaling Installations (’06~’07)
※ In : ea., km
Classification | Lines | Length(km) | Stations | |
---|---|---|---|---|
A.T.C | ’06 | 4 | 299.9 | 46 |
’07 | 4 | 299.9 | 46 | |
C.T.C | ’06 | 20 | 1,812.5 | 304 |
’07 | 21 | 1,927.5 | 320 | |
A.B.S | ’06 | 24 | 2,492.8 | 394 |
’07 | 23 | 2,452.0 | 392 | |
A.T.S | ’06 | 54 | 3,392.0 | 525 |
’07 | 54 | 3,399.1 | 526 | |
Elec. interlocking | ’06 | - | - | 259 |
’07 | - | - | 259 | |
Electron. interlocking | ’06 | - | - | 238 |
’07 | - | - | 262 | |
Mech. interlocking | ’06 | - | - | 5 |
’07 | - | - | 5 |
Source : KORAIL (※ including high speed lines)